AP Physics Bridge, Jordan and Kathleen
Monday, June 3, 2013
Tension
Our bridge was built correctly, because it failed when the middle bar broke. There was the most tension here, which was consistent with the bridge plan.
Thursday, May 30, 2013
Tuesday, May 28, 2013
Bridge building, day 4
Today we had to replace some tubes due to a cutting mishap. We were able to redo them quickly and we then moved onto gluing the trusses. We tried to pull the 2 mm strips taught for as much tension as possible. The trusses seem a bit wobbly, but will hopefully be steadied when the entire bridge has been put together.